Selected package
Leftover:
We use necessary cookies for the cart, session, and security. Analytics cookies help us improve the site and can be turned off. Marketing cookies are enabled only with your consent. Learn more
Polifarb App
Install Polifarb on your device?
Add the store to your home screen for faster access and an app-like full-screen experience.
It installs in a couple of taps — here is how.
Tap in the Safari toolbar
Choose “Add to Home Screen”
To install the app, open this site in the Safari browser.
Search
Start typing to see suggestions.
Save to favorites
Compare
A floor-covering adhesive rated at 2000 kg/m². Vinyl, carpet, parquet and LVT Suitable for underfloor heating
Selected package
Leftover:
Cheaper package combination
pcs
Leftover:
Ultra Lip is a ready-to-use one-component acrylic adhesive for floor coverings.
The joint survives repeated heating and cooling without embrittling, and the -40 to +100 °C range covers any wet or electric circuit.
Twice the base assembly adhesive. A floor takes point loads every day: furniture feet, chair castors, heels.
Domestic vinyl including unbacked, foam- and felt-backed, carpet and cork, parquet, LVT, polyester-backed rugs, chipboard, hardboard and plywood onto concrete, cement screed, timber, aerated concrete, chipboard, hardboard and OSB.
The maker also allows exterior work: terraces and covered porches. Beige, so seams show less on light coverings than a white adhesive.
Apply at +5 to +35 °C on a dry screed. 0.2–0.25 kg/m² spread solid, full cure 24–48 hours. 1.2, 3, 6 and 12 kg, 18-month shelf life, water clean-up.
0.2–0.25 kg/m² spread solid with a notched trowel: the most economical floor adhesive in the range.
Rough or porous screeds use more: prime them first.
Preparation
Application
Laying
Afterwards
| Material / Base | Concrete, brick | Gypsum, plasterboard | Stone, granite, marble | Wood, chipboard, fiberboard, MDF, plywood |
|---|---|---|---|---|
| Linoleum | - | |||
| Parquet | ||||
| PVC coverings | ||||
| Vinyl coverings | ||||
| Carpet coverings | ||||
| Wood, chipboard, fiberboard, MDF, plywood |
Underfloor heating?
Yes. Switch off a day before, back on no sooner than three days after, raising the temperature gradually.
How much for a 4×5 m room?
20 m² needs about 4.5 kg: a 6 kg pail.
Parquet?
Yes; check the guidance from the board manufacturer for wide solid boards.
When can furniture go back?
After 24–48 hours.
Terraces?
Yes, it is approved for exterior work and serves from -40 °C, provided the screed is waterproofed beneath.
4 similar products